FilesNorth Port Data CenterRecord 044
Prev: Deep Park Narrative Claim of ConsistencyNext: Governor DeSantis Data-Center Announcement

Record 044 · Place · 2026
67%26.44.D
Site Design: Parking, Landscape, Circulation
North Port Holdings 300 LLC · requested inclusion
“Narrative: seven principal buildings with parking, utility infrastructure, stormwater, landscaping, and internal circulation, designed to AC-6 standards.”
A data-center SDP is still a site plan: drives, ponds, buffers, landscape. Those sheets are in the hub even when news photos show only a footprint.
The non-building half of the SDP.
- AC-6 site standards
- Internal circulation
- Landscape and parking
The campus around the seven halls.



